为什么大型项目,包括核电站,交付超预算和延迟?原因和补救措施
Why are Megaprojects, Including Nuclear Power Plants, Delivered Overbudget and Late? Reasons and Remedies
摘要:
在第一部分中,本报告分析了大型项目背景下的核电站(NPP),解释了为什么它们经常超出预算和延迟交付。在第二部分,报告讨论了小型模块化反应堆(SMR)如何解决这些问题。巨型项目风险极大,往往在项目规划的次优阶段之后实施,导致低估成本和高估短期效益。当考虑到对进度和预算的遵守时,通常大型项目可能会被认为是失败的,乐观偏见,战略错误陈述,复杂性,规划不善,风险分配不善,范围管理不善都是解释其超出预算和延迟的原因。对于大型项目,特别是在核领域,实现良好绩效的关键策略似乎是标准化。这种标准化需要有两个方面:(一)技术标准化,即一遍又一遍地构建非常相似的设计;(二)项目交付链标准化,即参与交付可多次复制的项目的相同利益相关者。从这一角度来看,鉴于其规模和标准化潜力,SMR可能是几个国家合适的NPP类别。然而,如果规模经济是唯一考虑的驱动因素,那么SMR很难与大型NPP(甚至与天然气或煤炭发电厂)竞争。然而,一系列标准SMR可能会平衡规模经济的缺乏与倍数经济,并且交付几个标准化SMR项目可能是在核部门实现良好项目管理绩效的关键。然而,SMRs的部署面临着许可证、供应链和融资等多个方面的挑战。这些挑战可能是巨大的,但潜在的回报也是巨大的。
英文摘要:
In the first section, this report analyses Nuclear Power Plants (NPPs) in the context of megaprojects, explaining why they are often delivered over budget and late. In the second section, the report discusses how Small Modular Reactors (SMRs) might address these issues. Megaprojects are extremely risky and often implemented after a sub-optimal phase of project planning leading to underestimations of the costs and overestimation of short-term benefits. When considering adherence to schedule and budget, often megaprojects might be considered a failure, and optimism bias, strategic mis-rapresentation, complexity, poor planning, poor risk allocation, poor scope management are all reasons to explain their over budget and delay. For megaprojects, especially in the nuclear field, a key strategy to achieve good performances appears to be the standardization. This standardization needs to be twofold: (i) technical standardisation, i.e. the construction of very similar design over and over, and (ii) the project delivery chain standardisation, i.e. the same stakeholders involved in the delivery of a project that is replicable multiple times. Under this perspective, given their size and standardisation potential, SMRs, might be a suitable class of NPP for several countries. Yet, if the economy of scale is the only driver considered, SMRs are hardly competitive with large NPPs (or even with gas or coal power plants). However, a fleet of standard SMRs might balance the lack of economy of scale with the economy of multiples, and the delivery of several standardised SMR projects might be the key to achieve good project management performances in the nuclear sector. However, the deployment of SMRs faces a number of challenges from several perspectives, such as the licencing, supply chain and financing ones. These challenges might be enormous, but so are the potential rewards too.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。