无信号交叉口的拥挤分析:不耐烦和马尔可夫排队的影响
Congestion analysis of unsignalized intersections: The impact of impatience and Markov platooning
摘要:
本文研究了两种交通流共用的无信号交叉口。车流使用一条主要道路,并具有优先于其他车流的优先权。如果主干道上的两辆后续车辆之间的间隙大于其临界车头时距,则属于后一个车流的车辆穿过主干道。一个自然出现的问题与二级道路的容量有关:给定主要道路上车辆的到达模式,可以维持的低优先级车辆的最大到达率是多少?本文通过考虑一个紧凑的模型来解决这个问题,该模型揭示了所考虑的无信号交叉口的动态。该模型,这是一个嵌入式理论的性质,揭示了有趣的见解的影响,用户行为的稳定性。本文的贡献有三个方面。首先,我们获得了新的结果,上述模型,包括司机不耐烦。其次,我们揭示了一些令人惊讶的方面,仍然没有观察到在现有的文献中,到目前为止,其中许多是由这样一个事实,即次要道路的能力不能表示在\emph{mean}间隙大小,而是更详细的特征的关键车头时距分布起着至关重要的作用。第三个贡献是引入了一种新形式的主要道路上的聚束,称为马尔可夫排队。这个模型的易处理性,使我们能够研究的主要道路上的容量的次要道路上的各种车队编队的影响。
英文摘要:
This paper considers an unsignalized intersection used by two traffic streams. A stream of cars is using a primary road, and has priority over the other stream. Cars belonging to the latter stream cross the primary road if the gaps between two subsequent cars on the primary road are larger than their critical headways. A question that naturally arises relates to the capacity of the secondary road: given the arrival pattern of cars on the primary road, what is the maximum arrival rate of low-priority cars that can be sustained? This paper addresses this issue by considering a compact model that sheds light on the dynamics of the considered unsignalized intersection. The model, which is of a queueing-theoretic nature, reveals interesting insights into the impact of the user behavior on stability. The contributions of this paper are threefold. First, we obtain new results for the aforementioned model that includes driver impatience. Secondly, we reveal some surprising aspects that have remained unobserved in the existing literature so far, many of which are caused by the fact that the capacity of the minor road cannot be expressed in terms of the \emph{mean} gap size; instead more detailed characteristics of the critical headway distribution play a crucial role. The third contribution is the introduction of a new form of bunching on the main road, called Markov platooning. The tractability of this model allows us to study the impact of various platoon formations on the main road on the capacity of the minor road.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。