尼亚加拉边境商用和客运车辆的两国延误模式分析
Bi-National Delay Pattern Analysis For Commercial and Passenger Vehicles at Niagara Frontier Border
摘要:
纽约州和南安大略省之间的过境延误造成了巨大的经济损失和大规模的环境污染等问题。在这一地区,有三个过境港口:尼亚加拉边境的和平桥(PB)、彩虹桥(RB)和刘易斯顿-昆斯顿桥(LQ)。本文的目标是弄清楚的分布,两国的商业和客运车辆的等待时间是均匀分布在三个港口,并揭示隐藏的重大影响因素,导致可能的利用不足。存档了2016年8月22日至2017年6月20日期间7:00至21:00的历史边境等待时间数据,以及相应的时间和天气数据。对于每个方向的每种车辆类型,构建决策树以识别三个桥上的各种边界延迟模式。我们发现,对于前往美国的客运车辆,加拿大高速公路与美国I-190之间的便捷连接LQ和PB可能会导致这两个桥梁比RB更拥挤,特别是当它是在加拿大的假期。对于另一方向的客运车辆,RB在某些情况下比LQ和PB更拥挤,夏季前往美国尼亚加拉大瀑布的游客可能是一个原因。对于到美国的商用卡车,各种延迟模式显示PB总是比LQ更拥挤。在四棵决策树中,小时间隔和周末是最显著的因素。这些决策树可以帮助当局在满足相应条件时做出具体的路由建议。
英文摘要:
Border crossing delays between New York State and Southern Ontario cause problems like enormous economic loss and massive environmental pollutions. In this area, there are three border-crossing ports: Peace Bridge (PB), Rainbow Bridge (RB) and Lewiston-Queenston Bridge (LQ) at Niagara Frontier border. The goals of this paper are to figure out whether the distributions of bi-national wait times for commercial and passenger vehicles are evenly distributed among the three ports and uncover the hidden significant influential factors that result in the possible insufficient utilization. The historical border wait time data from 7:00 to 21:00 between 08/22/2016 and 06/20/2017 are archived, as well as the corresponding temporal and weather data. For each vehicle type towards each direction, a Decision Tree is built to identify the various border delay patterns over the three bridges. We find that for the passenger vehicles to the USA, the convenient connections between the Canada freeways with USA I-190 by LQ and PB may cause these two bridges more congested than RB, especially when it is a holiday in Canada. For the passenger vehicles in the other bound, RB is much more congested than LQ and PB in some cases, and the visitors to Niagara Falls in the USA in summer may be a reason. For the commercial trucks to the USA, the various delay patterns show PB is always more congested than LQ. Hour interval and weekend are the most significant factors appearing in all the four Decision Trees. These Decision Trees can help the authorities to make specific routing suggestions when the corresponding conditions are satisfied.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。