压缩空气能量转换.第II部分:在电力系统机组组合中的应用
Compressed Air Energy Storage-Part II: Application to Power System Unit Commitment
摘要:
机组组合是电力系统运行中的重要问题之一。为了将更高的风力发电渗透到电力系统中,正在建造更多的压缩空气储能(CAES)工厂。用于电力系统优化问题的CAES的现有洞穴模型是不准确的,这可能导致不可行的解决方案,例如,洞穴内的气压超出其工作范围。在这方面,一个准确的CAES模型,提出了UC问题的基础上,提出了准确的双线性洞穴模型在第一篇文章中,这两部分系列。考虑了CAES充放电过程的最小切换时间。整个模型,即,UC模型与精确的CAES模型,是一个大规模的混合整数双线性规划问题。为了降低整个模型的复杂性,提出了三种策略来减少双线性项的数量而不牺牲精度。McCormick松弛和分段线性化,然后线性化整个模型。为了减少求解时间,提出了一种获得线性化模型初始解的方法。通过一个改进的RTS-79系统验证了整个模型和求解方法的有效性。
英文摘要:
Unit commitment (UC) is one of the most important power system operation problems. To integrate higher penetration of wind power into power systems, more compressed air energy storage (CAES) plants are being built. Existing cavern models for the CAES used in power system optimization problems are not accurate, which may lead to infeasible solutions, e.g., the air pressure in the cavern is outside its operating range. In this regard, an accurate CAES model is proposed for the UC problem based on the accurate bi-linear cavern model proposed in the first paper of this two-part series. The minimum switch time between the charging and discharging processes of CAES is considered. The whole model, i.e., the UC model with an accurate CAES model, is a large-scale mixed integer bi-linear programming problem. To reduce the complexity of the whole model, three strategies are proposed to reduce the number of bi-linear terms without sacrificing accuracy. McCormick relaxation and piecewise linearization are then used to linearize the whole model. To decrease the solution time, a method to obtain an initial solution of the linearized model is proposed. A modified RTS-79 system is used to verify the effectiveness of the whole model and the solution methodology.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。