双机全纯嵌入法基于等效及弱机确定
Two-Bus Holomorphic Embedding Method-based Equivalents and Weak-Bus Determination
AI总结:
本文提出改进的全纯嵌入法用于电力流问题,通过改进的sigma条件确定弱机,并通过数值结果验证其有效性。
摘要:
一种新的电力流问题求解方法,全纯嵌入负荷流法(HELM)理论上能保证在达到鞍点分支点(SNBP)之前找到高压解,前提是使用足够的精度并满足Stahls定理的条件。Sigma指数已被提出作为当前运行点到SNBP距离的估计指标,以及系统中弱机的指示器。本文显示,[2]中提出的sigma条件无法产生可靠结果,而改进的条件可产生SNBP的紧上界。介绍了一种利用HEM幂级数估计系统中弱机的方法,并与传统模态分析在14节点系统中进行了数值比较。
英文摘要:
A new method of solving the power-flow problem, the holomorphically embedded load-flow method (HELM) is theoretically guaranteed to find the high-voltage solution, if one exists, up to the saddle-node bifurcation point (SNBP), provided sufficient precision is used and the conditions of Stahls theorem are satisfied. Sigma indices, have been proposed as estimators of the distance from the present operating point to the SNBP, and indicators of the weak buses in a system. In this paper, it is shown that the sigma condition proposed in [2] will not produce reliable results and that a modified requirement can be used to produce a tight upper bound on the SNBP. Introduced is an approach to estimate the weak buses in the system using the HEM power series with numerical results compared to traditional modal analysis for a 14-bus system.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。