EffiTest:用于配置硅后可调缓冲器的有效延迟测试和统计预测
EffiTest: Efficient Delay Test and Statistical Prediction for Configuring Post-silicon Tunable Buffers
摘要:
在纳米制造技术节点,工艺变化显著影响电路性能。为了对抗它们,可以部署后硅时钟调谐缓冲器以在制造之后平衡每个单独芯片的关键路线的定时萌芽。这种方法的挑战是,路径延迟应measure- sured为每个芯片配置的调谐缓冲器正确。用于这种延迟测量的当前方法依赖于路径式频率步进。然而,这种策略需要花费大量的测试人员的时间。在本文中,我们提出了一种高效的延迟测试框架(EffiTest),通过使用电路中现有的调谐缓冲器对齐路径延迟来解决硅后测试问题。此外,我们只测试有代表性的路径和其他路径的延迟估计的统计延迟预测。实验结果表明,该方法可以减少频率步进迭代次数94%以上,而成品率损失很小。
英文摘要:
At nanometer manufacturing technology nodes, process variations significantly affect circuit performance. To combat them, post- silicon clock tuning buffers can be deployed to balance timing bud- gets of critical paths for each individual chip after manufacturing. The challenge of this method is that path delays should be mea- sured for each chip to configure the tuning buffers properly. Current methods for this delay measurement rely on path-wise frequency stepping. This strategy, however, requires too much time from ex- pensive testers. In this paper, we propose an efficient delay test framework (EffiTest) to solve the post-silicon testing problem by aligning path delays using the already-existing tuning buffers in the circuit. In addition, we only test representative paths and the delays of other paths are estimated by statistical delay prediction. Exper- imental results demonstrate that the proposed method can reduce the number of frequency stepping iterations by more than 94% with only a slight yield loss.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。