arXiv 1702.05403physics.soc-ph
收藏

在中大陆独立系统算子中刻画可再生能源的削减和不经济性

Characterizing Curtailed and Uneconomic Renewable Power in the Mid-continent Independent System Operator

Andrew A. Chien, Fan Yang, Chaojie Zhang

摘要:

随着电网纳入越来越多的可再生能源发电,如风能和太阳能,它们的可变性对电网稳定性和效率带来了越来越大的挑战。我们研究两个方面:电网不能接受的电力(削减),以及电网分配的零经济价值的电力(负或零价格)。我们统称为这些“搁浅的权力”或SP。我们研究搁浅的权力在中部大陆独立系统运营商(MISO),表征数量和时间结构。首先,MISO电网中99%的时间都有搁浅的电力,并且通常间隔>100小时,具有典型的季节和时间模式。平均搁浅功率通常超过1吉瓦,占空因数高达30%。MISO约有30%的风力发电被搁浅。对前10个单独站点的检查显示,搁浅功率可高达70%的占空因数和250兆瓦。过去3.5年的趋势表明,搁浅的电力是一个持续的现象。这项研究描述了利用搁浅权力的机会。我们考虑使用储能来增加搁浅电力的效用。对于一系列的功率水平和均匀分布的存储,增加5小时的存储将占空因数增加一倍,达到4MW时的30%,但接下来的15%增加需要另外95小时。在4MW和50小时的存储条件下,200个站点中只有3个站点达到100%占空因数,接下来的10个站点需要100小时。更高的功率水平需要100小时。前10个站点的存储效率更高,5小时将占空因数提高到4MW时的70%,但进一步存储的好处越来越少。对存储所提供的电力量的研究表明,分配到最好的站点比均匀分配提供2到3.7倍的优势。

英文摘要:

As power grids incorporate increased renewable generation such as wind and solar, their variability creates growing challenges for grid stability and efficiency. We study two facets: power the grid is unable to accept (curtailment), and power that is assigned zero economic value by the grid (negative or zero price). Collectively we term these "stranded power" or SP. We study stranded power in the Midcontinent Independent System Operator (MISO), characterizing quantity and temporal structure. First, stranded power is available in the MISO grid 99% of the time, and often in intervals >100 hours, with characteristic seasonal and time-of-day patterns. Average stranded power often exceeds 1 GW, with duty factors as high as 30%. About 30% of all wind generation in MISO is stranded. Examination of the top 10 individual sites shows stranded power can be as high as 70% duty factor and 250MW. Trends over the past 3.5 years suggest stranded power is a persistent phenomenon. The study characterizes opportunities to exploit stranded power. We consider using energy storage to increase the utility of stranded power. For a range of power levels and uniformly-distributed storage, adding 5 hours of storage doubles duty factor to 30% at 4MW, but another 95 hours is required for the next 15% increase. At 4MW with 50 hours of storage, only 3 of 200 sites reach 100% duty factor, and with 100 hours required for the next 10 sites. Higher power levels require 100's of hours. Storage at the top 10 sites is more productive, 5 hours increases duty factor to 70% at 4MW, but further storage has diminishing benefits. Studies of the amount of power served by storage show that distribution to the best sites provides 2 to 3.7-fold advantages over uniform distribution.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑