具有装配和日程约束的并行机总拖期最小化排序规则
Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints
摘要:
在制药和化妆品行业,质量控制的前置时间是造成时间损失的最重要原因之一。这部分是由于实验室的组织特点是并行多功能机器的色谱分析。测试过程需要较长的设置时间,并且需要操作员启动该过程。各种控制是非抢占式的,其特征在于发布日期、到期日和可用路由。这些质量过程导致显着的延误,因此,我们评估总延误标准。以前的调度定义为总延误标准,并行机,和设置,如ATC(表观延误成本)和ATCS(ATC与设置)。我们提出了新的规则和模拟退火过程,以尽量减少总延误。
英文摘要:
Quality control lead times are one of most significant causes of loss of time in the pharmaceutical and cosmetics industries. This is partly due to the organization of laboratories that feature parallel multipurpose machines for chromatographic analyses. The testing process requires long setup times and operators are needed to launch the process. The various controls are non-preemptive and are characterized by a release date, a due date and available routings. These quality processes lead to significant delays, and we therefore evaluate the total tardiness criterion. Previous heuristics were defined for the total tardiness criterion, parallel machines, and setup such as ATC (Apparent Tardiness Cost) and ATCS (ATC with setups). We propose new rules and a simulated annealing procedure in order to minimize total tardiness.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。