arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 1412.6392cs.DC
收藏

一种面向科学应用的HPC环境和云的自适应自动缩放方法

A Self-adaptive Auto-scaling Method for Scientific Applications on HPC Environments and Clouds

Kiran Mantripragada, Alecio Binotto, Leonardo P. Tizzei

摘要:

高强度计算应用程序通常需要几天到几个月才能完成执行。在此期间,当考虑到这种硬件通常在组织内的多个研究人员/部门之间共享时,通常具有可用资源的变化。另一方面,高性能集群可以利用云计算突发技术来执行应用程序以及内部资源。为了满足最后期限,高密集型计算应用程序可以在数据和任务并行时使用云来提高其性能。本文介绍了一项正在进行的工作,旨在将HPC执行平台的扩展资源与云一起使用。我们提出了一个统一的视图,这样的异构环境和方法,监测,预测应用程序的执行时间,并动态地转移域的一部分-以前运行在本地HPC硬件-在云计算,然后满足特定的截止日期。该方法与地震应用程序一起举例说明,该应用程序在运行时自适应将部分处理移动到云(在称为突发的移动中),并在云节点上自动缩放(移动的部分)。我们的初步结果表明,执行此移动和同步结果会产生预期的开销,但我们的结果表明,在内部部署集群过载或无法提供特定项目所需的容量的情况下,这是满足最后期限的重要功能。

英文摘要:

High intensive computation applications can usually take days to months to finish an execution. During this time, it is common to have variations of the available resources when considering that such hardware is usually shared among a plurality of researchers/departments within an organization. On the other hand, High Performance Clusters can take advantage of Cloud Computing bursting techniques for the execution of applications together with the on-premise resources. In order to meet deadlines, high intensive computational applications can use the Cloud to boost their performance when they are data and task parallel. This article presents an ongoing work towards the use of extended resources of an HPC execution platform together with Cloud. We propose an unified view of such heterogeneous environments and a method that monitors, predicts the application execution time, and dynamically shifts part of the domain -- previously running in local HPC hardware -- to be computed on the Cloud, meeting then a specific deadline. The method is exemplified along with a seismic application that, at runtime, adapts itself to move part of the processing to the Cloud (in a movement called bursting) and also auto-scales (the moved part) over cloud nodes. Our preliminary results show that there is an expected overhead for performing this movement and for synchronizing results, but our outcomes demonstrate it is an important feature for meeting deadlines in the case an on-premise cluster is overloaded or cannot provide the capacity needed for a particular project.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑