基于HLA和FMI标准的智能电网从协同仿真到多仿真
From Co- Toward Multi-Simulation of Smart Grids based on HLA and FMI Standards
摘要:
在这篇文章中,提出了一个多仿真模型来衡量所有的智能电网的角度定义在IEEE P2030标准的性能。作为初步实现,一种新的信息技术(IT)和通信多模拟器的开发遵循高层体系结构(HLA)。为了说明这样的多模拟器的有用性,一个配电网操作应用的案例研究,提出了使用现实世界的拓扑结构配置与现实的通信流量的基础上IEC 61850。多模拟器允许在通信延迟和系统可靠性方面量化当长期演进(LTE)网络故障发生时基于数字移动无线电(DMR)在低容量无线链路上聚合所有业务的影响。案例研究表明,这样的多模拟器可用于实验新的智能电网机制,并验证其影响的所有智能电网的观点,以自动化的方式。更重要的是,多重仿真可以在修改/升级智能电网之前防止问题,从而潜在地降低公用事业成本。
英文摘要:
In this article, a multi-simulation model is proposed to measure the performance of all Smart Grid perspectives as defined in the IEEE P2030 standard. As a preliminary implementation, a novel information technology (IT) and communication multi-simulator is developed following an High Level Architecture (HLA). To illustrate the usefulness of such a multi-simulator, a case study of a distribution network operation application is presented using real-world topology configurations with realistic communication traffic based on IEC 61850. The multi-simulator allows to quantify, in terms of communication delay and system reliability, the impacts of aggregating all traffic on a low-capacity wireless link based on Digital Mobile Radio (DMR) when a Long Term Evolution (LTE) network failure occurs. The case study illustrates that such a multi-simulator can be used to experiment new smart grid mechanisms and verify their impacts on all smart grid perspectives in an automated manner. Even more importantly, multi-simulation can prevent problems before modifying/upgrading a smart grid and thus potentially reduce utility costs.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。