基于EFDA WP12预概念研究的DEMO聚变发电厂的维修持续时间估算

Maintenance Duration Estimate for a DEMO Fusion Power Plant, based on the EFDA WP12 pre-conceptual studies

O. Crofts, J. Harman

摘要:

聚变发电厂中的腐蚀和高中子通量导致需要频繁地远程更换面向等离子体的部件。这是一个复杂且耗时的远程处理操作,其持续时间直接影响发电厂的可用性,从而影响其商业可行性。需要一种工具来确定维护持续时间,以便根据部件设计对维护持续时间的影响来评估部件设计的发展。这允许在一方面的组件成本和性能与另一方面的远程处理成本和工厂可用性之间取得正确的平衡。

英文摘要:

The erosion and high neutron flux in a fusion power plant results in the need for frequent remote replacement of the plasma facing components. This is a complex and time consuming remote handling operation and its duration directly affects the availability and therefore the commercial viability of the power plant. A tool is needed to allow the maintenance duration to be determined so that developments in component design can be assessed in terms of their effect on the maintenance duration. This allows the correct balance to be drawn between component cost and performance on the one hand and the remote handling cost and plant availability on the other.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑