Operational experience with crab cavities at KEKB
摘要:
KEKB于1988年12月至2010年6月运营。螃蟹腔于2007年2月安装在KEKB,并一直稳定工作到KEKB运营结束。介绍了带梁蟹洞的施工经验。
英文摘要:
KEKB was in operation from December 1988 to June 2010. The crab cavities were installed at KEKB in February 2007 and worked very stably until the end of KEKB operation. Operational experience of the crab cavities with beams is described.