一种通过策略切换整合负载削减和孤岛保护方案的方法
A Policy Switching Approach to Consolidating Load Shedding and Islanding Protection Schemes
AI总结:
本文提出一种算法方法,通过策略切换整合传统负载削减和孤岛保护方案,以优化电力网络在故障发生前后运行性能。
摘要:
近年来,关键基础设施系统可靠性有所提高,但电力系统行业在这方面进步有限。例如,电力质量缺陷、局部故障数量多以及大规模连锁停电仍普遍存在。尽管发电、输电和配电基础设施有所改善,但补救措施方案(RAS)仍非标准化,且在不同公用事业、ISO和RTO之间实施不统一。传统负载削减和孤岛保护在抑制故障传播和大规模连锁停电方面效果显著。本文提出一种新的算法方法,用于选择RAS策略以优化电力网络在故障发生前后运行。具体而言,我们利用策略切换整合传统负载削减和孤岛方案。为建模和模拟所提电力系统保护算法的功能,我们使用西门子PSS/E进行蒙特卡洛和时域仿真。通过在IEEE-39拓扑上进行实验,证明所提方法在特定RAS策略下能够实现最优的电力系统性能。
英文摘要:
In recent years there have been many improvements in the reliability of critical infrastructure systems. Despite these improvements, the power systems industry has seen relatively small advances in this regard. For instance, power quality deficiencies, a high number of localized contingencies, and large cascading outages are still too widespread. Though progress has been made in improving generation, transmission, and distribution infrastructure, remedial action schemes (RAS) remain non-standardized and are often not uniformly implemented across different utilities, ISOs, and RTOs. Traditionally, load shedding and islanding have been successful protection measures in restraining propagation of contingencies and large cascading outages. This paper proposes a novel, algorithmic approach to selecting RAS policies to optimize the operation of the power network during and after a contingency. Specifically, we use policy-switching to consolidate traditional load shedding and islanding schemes. In order to model and simulate the functionality of the proposed power systems protection algorithm, we conduct Monte-Carlo, time-domain simulations using Siemens PSS/E. The algorithm is tested via experiments on the IEEE-39 topology to demonstrate that the proposed approach achieves optimal power system performance during emergency situations, given a specific set of RAS policies.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。