ERP项目内部利益相关者网络及其对项目成果的影响
ERP projects Internal Stakeholder network and how it influences the projects outcome
摘要:
到目前为止,很少有努力投入到研究内部ERP项目利益相关者相互作用的重要性,认识到项目的复杂性,对整个组织的影响,和高风险的一个有用的最终结果。本研究分析了项目网络中利益相关者的互动关系和地位,以及他们的关键性,潜在的瓶颈和冲突。主要使用的方法是社会网络分析,并为个别球员的驱动程序的启发。信息收集自三个大型ERP项目的几个利益相关者,这些项目都是总部设在芬兰的全球公司,还有来自两个不同ERP供应商的代表和两名经验丰富的ERP顾问。该分析给出了利益相关者关键性(主要是项目经理、业务所有者和流程所有者)、中心化程度、紧密度、中介或瓶颈角色、关系纽带和冲突(个人,以及业务和项目组织之间的关系纽带和冲突)以及派系形成的定量和定性特征。建立了一个通用的内部利益相关者网络模型以及项目阶段的关键性。结果以建议清单的形式总结,供今后的企业资源规划项目处理内部利益攸关方的影响,项目管理应利用最新技术提供工具,增加利益攸关方之间的互动,并监测这些关系的强度。社会网络分析工具可用于项目中,使利益攸关方关系形象化,以便更好地了解与关系有关的可能风险(或缺乏关系)。
英文摘要:
So far little effort has been put into researching the importance of internal ERP project stakeholders mutual interactions,realizing the projects complexity,influence on the whole organization, and high risk for a useful final outcome. This research analyzes the stakeholders interactions and positions in the project network, their criticality, potential bottlenecks and conflicts. The main methods used are Social Network Analysis, and the elicitation of drivers for the individual players. Information was collected from several stakeholders from three large ERP projects all in global companies headquartered in Finland, together with representatives from two different ERP vendors, and with two experienced ERP consultants. The analysis gives quantitative as well as qualitative characterization of stakeholder criticality (mostly the Project Manager(s), the Business Owner(s) and the Process Owner(s)), degree of centrality, closeness, mediating or bottleneck roles, relational ties and conflicts (individual, besides those between business and project organizations), and clique formations. A generic internal stakeholder network model is established as well as the criticality of the project phases. The results are summarized in the form of a list of recommendations for future ERP projects to address the internal stakeholder impacts .Project management should utilize the latest technology to provide tools to increase the interaction between the stakeholders and to monitor the strength of these relations. Social network analysis tools could be used in the projects to visualize the stakeholder relations in order to better understand the possible risks related to the relations (or lack of them).
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。