在CSNS漂移管直线加速器(DTL)的研制过程中,研制了第一台28漂移管的单元加速箱。轴向加速场从2.2MV/m上升到3.1MV/m。所要求的场平坦度小于2%,束流动力学的标准偏差为1%。为保证电机稳定运行,磁场稳定度应小于1%。在成功对准之后,进行RF调谐,聚焦于场分布测量。四个段塞调谐器和11个后耦合器应用在这个过程中。通过微调段塞调谐器和后耦合器,实现了斜坡场和所需的稳定性。在本文中,初步的调谐结果,并进行了讨论。
英文摘要:
In the R&D of the CSNS Drift Tube Linac (DTL), the first unit tank with 28 drift tubes has been developed. The axial accelerating field is ramped from 2.2MV/m to 3.1MV/m in this tank. The required field flatness is less than 2 % with the standard deviation of 1 % for the beam dynamics. And the field stability should be less than 1% for machine stable operation. After the successful alignment, the RF tuning was carried out focusing on the field profile measurement. Four slug tuners and 11 post couplers were applied in this procedure. The ramped filed and required stability had been achieved by fine adjustment of the slug tuners and post couplers. In this paper, the preliminary tuning results are presented and discussed.