案例工具:使用新的3-不相交路径实现快速互连MIN仿真模块
Case Tool: Fast Interconnections with New 3-Disjoint Paths MIN Simulation Module
摘要:
多级互连网络(MIN)可以通过提供一组不相交的路径来实现容错和冲突解决。在本文中,我们正在讨论新的模拟器添加到开发容错MIN设计的工具。所设计的工具是它自己的一种,将帮助用户在开发2和3不相交的路径网络。该工具采用java技术进行设计,并在不同的软件平台上进行了测试。
英文摘要:
Multi-stage interconnection networks (MIN) can be designed to achieve fault tolerance and collision solving by providing a set of disjoint paths. In this paper, we are discussing the new simulator added to the tool designed for developing fault tolerant MINs. The designed tool is one of its own kind and will help the user in developing 2 and 3-disjoint path networks. The java technology has been used to design the tool and have been tested on different software platform.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。