Unary operator domains -- i.e., domains in which operators have a single effect -- arise naturally in many control problems. In its most general form, the problem of STRIPS planning in unary operator domains is known to be as hard as the general STRIPS planning problem -- both are PSPACE-complete. However, unary operator domains induce a natural structure, called the domain's causal graph. This graph relates between the preconditions and effect of each domain operator. Causal graphs were exploited by Williams and Nayak in order to analyze plan generation for one of the controllers in NASA's Deep-Space One spacecraft. There, they utilized the fact that when this graph is acyclic, a serialization ordering over any subgoal can be obtained quickly. In this paper we conduct a comprehensive study of the relationship between the structure of a domain's causal graph and the complexity of planning in this domain. On the positive side, we show that a non-trivial polynomial time plan generation algorithm exists for domains whose causal graph induces a polytree with a constant bound on its node indegree. On the negative side, we show that even plan existence is hard when the graph is a directed-path singly connected DAG. More generally, we show that the number of paths in the causal graph is closely related to the complexity of planning in the associated domain. Finally we relate our results to the question of complexity of planning with serializable subgoals.
Representation and Synthesis of C++ Programs for Generalized Planning
Universitat Pompeu Fabra(庞培法布拉大学);Florida Universitària(佛罗里达大学);VRAIN - Valencian Research Institute for Artificial Intelligence, Universitat Politècnica de València(瓦伦西亚理工大学瓦伦西亚人工智能研究所(VRAIN))
Parameterized Complexity and Kernel Bounds for Hard Planning Problems
Linköping University(林雪平大学);Masaryk University(马萨里克大学);Vienna University of Technology(维也纳技术大学)
命题规划问题是一个非常困难的计算问题。Downey et al.(1999)提出了规划的参数化分析(以规划长度为参数),Bäckström et al.(2012)继承了这一研究思路,在各种限制条件下进行了广泛的参数化分析,只留下了一个顽固的案例。我们继续这项工作,并提供一个完整的分类。特别是,我们表明,当行动没有先决条件,最$e$后置条件是固定参数易处理的情况下,如果$e\leq 2$和W[1]-完全,否则。我们通过简化为Steiner树问题的一个变体来展示固定参数的易处理性; Guo et al.(2007)已经证明了这个问题是固定参数易处理的。如果一个问题是固定参数易处理的,那么它允许一个多项式时间自约化的实例,其输入大小由参数的函数(称为核)限制。对于某些问题,该函数甚至是多项式,这具有期望的计算含义。最近的研究在参数化的复杂性集中在分类固定参数的易处理的问题,他们是否承认多项式核或没有。我们重新审视所有以前获得的限制规划是固定参数的易处理的,并表明,他们都不承认一个多项式内核,除非多项式层次结构崩溃到第三级。